Biological Risk Assessment of Automobile Companies- A Case Study of Saipa as the Second Largest Iranian Car Manufacturer
Samira Seifalian1 , Hossein Yadegari2 and Akbar Mokhtari Azar3 *
1
Department of Bachelor of Environmental Health Engineering,
University of Medicine,
Qazvin,
Iran
2
Hospital Management Research Center,
Iran University of Medical Sciences,
Tehran,
Iran
3
Department of Health,
Islamic Azad University,
Tehran Medical Branch,
Tehran,
Iran
DOI: http://dx.doi.org/10.12944/CWE.9.1.11
Copy the following to cite this article:
Seifalian S, Yadegari H, Azar A. M. Biological Risk Assessment of Automobile Companies- A Case Study of Saipa as the Second Largest Iranian Car Manufacturer. Curr World Environ 2014;9(1) DOI:http://dx.doi.org/10.12944/CWE.9.1.11
Copy the following to cite this URL:
Seifalian S, Yadegari H, Azar A. M. Biological Risk Assessment of Automobile Companies- A Case Study of Saipa as the Second Largest Iranian Car Manufacturer. Curr World Environ 2014;9(1). Available from: http://www.cwejournal.org/?p=5710
Download article (pdf) Citation Manager Publish History
Select type of program for download
Endnote EndNote format (Mac & Win) | |
Reference Manager Ris format (Win only) | |
Procite Ris format (Win only) | |
Medlars Format | |
RefWorks Format RefWorks format (Mac & Win) | |
BibTex Format BibTex format (Mac & Win) |
Article Publishing History
Received: | 2014-01-12 |
---|---|
Accepted: | 2014-03-02 |
Human being has afallible naturewhose mistakesare inevitable. Thereby, from ancient timespeopleare looking forwaysto reducetheirriskoferrors.In other words, by improving workplace conditions, well-designing the equipment, and adopting appropriate strategies, the risk-generating factors should be minimize as much as possible(Ahmadi 2005b). Prior to 1931, safety experts tend to focus on physical strategies such as machine guards, regardless of discipline and grooming considerations.
They believed that accidents are caused by inappropriate physical conditions.Preventive actions such as awareness programs by posters, brochures, training workshops, etc. could also be effective factor in mitigating risky activities. According to which, the individuals at risk will learn how to control incidences. Heinrich offered a total of ten items including theories and concepts of industrial safety rules(Lees Frank 2004 ; Whittingham 2004; Jahangiri 2004). Following Heinrich’s thoughts, attentions have paid to the importance of unsafe activities as a main risk-generating factor in industries (Ahmadi 2005a).
In 1960s, there was emphasized on preventive engineering on reduced technical defect and increased equipment reliability and safety barriers. After plane crashes in 1974, and1980 as well as Three Miles Island in 1979, attention has drawn towards other issues of human fallibility, better education, improvement of human interactions - machinery, and support systems for the respond to the reduction and prevention of the spread of "human error"(Reason 2000; Ghalenoy 2006; Grozdanović2006).
Possibility index of human error is a quantitative and dynamic approach for taking into account human factors in risk assessment. This index is a method for identifying, evaluating and mitigating the risks associated with human errorsduring emergencyconditions(DiMattia et al. 2005, Khan et al. 2006). Carlos Conte et al. (2011) presented a generalized utility model for the diagnosis and prediction of accidents among the Spanish workforce with the aim of managing automatically work-related accidents at a national level.Jasch and Lavicka in 2006 was done a research on health and safety risk management of the Styrian automobile cluster in Austria. They prepared a management plan which is useful for small and medium sized companies as a starting point to shape their (EHS) system.
The present study aims atassessing biological risk center of Saipa Company as the second largest Iranian auto manufacturer.
Method:
The present study lasted for 12 mounts in Saipa Company as the second largest auto-manufacturer in Iran. . Accordingly, three environmental experts spent 6 mounts to detect biological risk centers in all parts of the company such as Production Unit including Painting Unit No. 1, Painting Unit No. 2, Body Unit No. 1,Body Unit No. 2,Assembly Unit No. 1, Assembly Unit No. 2, Press and non-production parts such as Power Post ,Gas Central, Power House , fuel tanks , polymer, C.M.M ,chemistry, metallurgy and mechanic, chemical material, Etka,Shirazi land, Saipa3, Seico, Sale, Saipa5,office,clinic, triple salon , maintenance ,technical affairs, restaurant, public places, road test, treatment plant, waste, underground canals, andstreets. The collected data were recorded, separately.
The famous PDCA Cycle suggested by Dr. Demingwere used to detectand record risky processes. After identifying risky centers, appropriate strategies were presented to combat the risks.
Using Cocran formula, the number of visiting was calculated for each month in separation of different unities in the company.
According to available data and Cocaran formula, the number of visiting was 29 for each month. Using the Excel Software, a total of 29 - 46 places were selected to be visited in each month.
After detecting all risky centers during the study period of 6 months, some weekly meetings were held in which HSE (Health, Safety and Environment) managers, maintenance and repairs, technical and energy services managers were participated in order to find proper mitigation measures. Finally, a corrective action planrelated to manufacturing and administrative units was prepared containing managerial strategies on maintenance and repairs, as well astechnical and energy services.
Corrective actions could be categorize in two types, one is related to equipments and another is associated with personnel behavior resolved by different ways (culture-buildingtrainings, brochures, pamphlets, etc). Subsequently, Procedure number PJ-01-001 was used to evaluate risk levels of each risky centers based upon criteria occurrence probability, occurrence probability and intensity.This method includes those requirements recommended by the standard OHSAS 18001, 2007. Table 1 is a sample checklist of PJ-01-001 Procedure derived from FMEA Method by which risky factors are evaluated based on a three-point qualitative scale (high, medium and low).
Table1- a sample checklist of PJ-01-001 Procedure to classify biological risky centers in Saipa Company. Click here to View table |
For determination risk identified rate according to appendix form 1, at first compute intense and probability of occurrence risk from below table then determination risk rate according to evaluating matrix.
In order to classify risky centers, the occurrence probability and intensity were initially be determined using Tables 2 and 3. Afterwards, they were ranked using the evaluating matrix. Occurrence intensity: The occurrence intensity was measured based on economic damages and losses to the personnel.
Table 2-Intense rating determination
Human | rating |
Death of more than 1 person | 7 |
Death of 1 person | 6 |
Disability over 60% | 5 |
Disability over 30% up to 60% | |
Disability 10% up to 30% | |
Disability less than 10% | |
Medical break of 7 days up to 1month | 4 |
Medical break of 2days up to 7 | 3 |
1 day Medical break | 2 |
First aid | 1 |
Occurrence probability was determined as follows using the coefficients in Tables 3, 4 and 5.
- Probability outcome (coefficient 6) (Table 3)
- Degree of exposure (coefficient 8) (Table 3)
- human and engineering control actions (coefficient 10) (Table 4)
- Ability to discover (coefficient 4) (Table 5)
The average of the mentioned coefficients was calculated using the following equation:
P-(4*ability to discovery + 6* outcome frequency + 8*degree of exposure + 10* control action)/28 ... (1)
Each of the factors was also calculated according to Tables 2,3 and4. If the probability result is a decisional number, the value will be roundedto one decimal place using the Equation 2.
Table 3- Outcome frequency and exposure to risky factors
Coefficient | Outcome frequency | Coefficient | Exposure to risk | ||
Safty | Occupation Health | General Health Person/Place | |||
10 | Every day happening | 10 | Every day exposure | > 480 | More than 2000 people |
9 | One day among | 9 | Every other day | 420-479 | 1001-1999 |
8 | Once a week | 8 | Once a week | 360-419 | 501-1000 |
7 | mid-week | 7 | mid- week | 300-359 | 301-500 |
6 | Once a month | 6 | Once a month | 240-299 | 201-300 |
5 | Every other 3 months | 5 | Every other 3 months | 180-239 | 101-200 |
4 | Every other 6 months | 4 | Every other 6 months | 120-179 | 51-100 |
3 | Once a year | 3 | Once a year | 60-119 | 11-50 |
2 | Once in 1-5 years | 2 | Once in 5 years | 30-59 | 2-10 |
1 | Once in more than 10 years | 1 | Once in more than 10 years | < 29 | 1 |
Table 4- Rating for the scope of control actions required
Human | Rate | Engineering | Rate |
Lack of awareness | 2 | Lack of control action | 8-10 |
Lack of personal protective equipment | 2 | Low effectiveness of control action | 8- 6 |
Lack of job satisfaction | 2 | Medium effectiveness of control action | 4- 6 |
Lack of job skills | 2 | Good effectiveness of control action | 2-4 |
Lack of health | 2 | Full effectiveness of control action | 0-2 |
10 Overall rating | 10 Rating |
Table 5- prioritization of risks
Discovery | Rating | Example |
Quite obvious risk | 1Ùˆ2 | The risk is easily recognized from a distance |
It is understood by all five senses | 4Ùˆ3 | Noise / light and ... Etc. has created |
Only one of the five senses can detect | 6Ùˆ5 | Just seen or heard or ... |
Should be used for the diagnosis of simple tools | 8Ùˆ7 | The phase meter, thermometer conventional |
Advanced tools are required to use | 9Ùˆ10 | Sensor or a digital tool |
Results: The studies showed that the biological risky centers detected during the six month of 2010 (September 23, 2010 to March 21, 2011) was 55 and in the next four months of 2011 correction action for all of the risky centers was issued. As a result, at the end of the fourth month the number of risky centers was reduced from 55 to 22 in the company; 60% reduction in this less period in a large industrial company is a really good success.
Figure 1 The reduction of biological risky centers in Saipa Company in duration of four month Click here to View figure |
Biological risky centers differ according to personnel function in production and administrative halls. A brief description is given in table 6. However, it should be mentioned that some of these biological risky centers are common halls because as they have been detected in the WC (health services).
Table 6- The couple of examples of biological risky centers in company
Production halls (place) | Administrative halls (place) | Others places and common halls (place) |
Small distance between the personnel | Desks surfaces and keyboards being contaminated (polluted or dirty) | The WC Being contaminated (polluted or dirty) |
Eating food on the floor and dirty cartons | Being ill and carriers servitor | No trash door |
Of contaminated protective devices(earmuff) | Glasses being contaminated(dirty glasses) | Water tap damage in WC (bathroom) |
The result of evaluation on biological risky centers in production halls is shown in table 7 and tables 8 -13 shows the evaluation of biological risky centers in non-production parts of the company.
Table 7- The results of evaluation of biological risky centers in production halls.
Place | Total | High | Medium | Low | |
Production | Body 1 | 33 | 2 | 13 | 18 |
Body 2 | 33 | 2 | 13 | 18 | |
Press | 33 | 0 | 13 | 20 | |
Die tools | 33 | 0 | 10 | 23 | |
paint 1 | 32 | 2 | 13 | 17 | |
paint 2 | 33 | 0 | 14 | 19 | |
Assembly 1 | 33 | 2 | 13 | 18 | |
Assembly 2 | 34 | 2 | 18 | 14 |
Table 8- The results of evaluation of biological risky centers in buildings
Place | Total | High | Medium | Low | |
Buildings | office | 34 | 0 | 2 | 32 |
Clinic | 33 | 0 | 2 | 31 |
As shown in table 8, there is no high risk case in buildings and there are 2 and 32 cases for medium and low risk respectively.
Table 9- The results of evaluation of biological risky centers in energy resources buildings
Place | Total | High | Medium | Low | |
energy resources | Power post | 2 | 0 | 0 | 2 |
Gas central | 2 | 0 | 0 | 2 | |
powerhouse | 29 | 0 | 3 | 26 | |
Fuel tanks | 2 | 0 | 0 | 2 |
As shown in table 9, there is no high risk case in energy resources buildings and there are 3 cases with medium risk and for low risk cases there are 26 cases in power house and 2 cases in other places (Fuel tanks,gas centraland power posts).
Table 10- The results of evaluation of biological risky centers in laboratories
Place | Total | High | Medium | Low | |
Laboratories | polymer | 12 | 0 | 1 | 11 |
C.M.M | 33 | 0 | 2 | 31 | |
chemistry | 12 | 0 | 1 | 11 | |
power | 12 | 0 | 1 | 11 | |
Metallurgy & mechanic | 12 | 0 | 1 | 11 |
As shown in table 10, there is no high-risk case in laboratories but there are 2 and 11 cases in medium risk and low risk, respectively, just in C.M.M there is 2 cases with medium risk and 31 cases with low risk.
Table 11 -The results of evaluation of biological risky centers in storages
Place | Total | High | Medium | Low | |
Warehouse | Receipt of goods | 30 | 0 | 2 | 28 |
Chemical material | 30 | 0 | 2 | 28 | |
Non-production | 30 | 0 | 4 | 26 | |
production | 30 | 0 | 7 | 23 |
Table 12-The results of evaluation of biological risky centers in out of company
Place | Total | High | Medium | Low | |
Out of company |
Etka |
27 |
0 |
4 |
23 |
Shirazi land |
14 |
0 |
0 |
14 |
|
Saipa 3 |
33 |
0 |
2 |
31 |
|
Seico |
27 |
0 |
4 |
23 |
|
Sale |
33 |
0 |
2 |
31 |
|
Saipa 5 |
33 |
0 |
2 |
31 |
Out of company are places that do some of the business companies in abroad. As shown in Table 12, the subsidiary centers have no high-risk cases and there are 4 and 31 cases with medium and low risk respectively.
Table 13-The results of evaluation of biological risky centers in workshops
Place | Total | High | Medium | Low | |
Workshops | Technical affairs | 29 | 0 | 4 | 25 |
Triple salon | 29 | 0 | 5 | 24 | |
Maintenance | 29 | 0 | 4 | 25 |
The variation of job (thing) in workshops usually is the same, for this reason the number of biological risky centers in all of them is the same - 29 cases. As shown in Table 13, workshops (production halls) have no high-risk cases and there are 5 and 25 cases with medium and low risk respectively.
Table 14 -The results of evaluation of biological risky centers in site
Place | Total | High | Medium | Low | |
site | Restaurant | 41 | 2 | 32 | 7 |
Public places | 20 | 0 | 6 | 14 | |
Road test | 14 | 0 | 1 | 13 | |
Treatment plant | 33 | 0 | 2 | 31 | |
Waste | 8 | 0 | 3 | 5 | |
Underground canals | 2 | 0 | 2 | 0 | |
Conex | 14 | 0 | 1 | 13 | |
streets | 10 | 1 | 6 | 3 |
As shown in table 14, there are 2 cases with high risk in restaurant, 6 and 32 cases with medium risk in public places and restaurant respectively and 14 and 31 cases with low risk in public places and treatment plant respectively.
Conclusion
Today's world has undergone a variety of pollution of noise, water, soil, biological, etc. caused by human recklessness. Risk centers in hygiene, immunity, and environment are different and have independent and separated identification. According to their extent of operating; these centers are less or more. In this investigation; tried to recording the huge part of biological risk centers in Saipa company. For this reason; the present research was done to identify biological risk centers in SAIPA. After recognizing the biological risk centers using the method PJ-01-001, it was found that there are a total of 33 biological risks in the restaurant. Treatment plant (with a total of 33 risks), public places (with a total of 20 risks), and Road Test Unit (with a total of 14 risks) are the main risk generating centers in the company.Moreover, public places, Road TestUnit, Treatment Plant, Waste Disposal, underground canals, and Conex has no high-risk biological centers. Based upon the obtained results, it was revealed that mitigation measures should be focused on two places restaurantand treatment plant.
References
- Ahmadi, A., 2005a. Safety Management inOil, Gas & Petrochemical Industries. Vol.1: Engineering Approach to Human Errors.First Edition.Pourshad
- Ahmadi, A., 2005b. Safety Management inOil, Gas & Petrochemical Industries. Vol.2: Preventing Methods from OccurringHuman Errors in Oil related Industries .FirstEdition.SepehrFatemi
- DiMattia, D.G., Khan, F.I. Amyotte, P.R.,2005. Determination of human errorprobabilities for offshore platform musters,Journal of Loss Prevention in the ProcessIndustries. 18, pp. 488–501
- Ghalenoy, M., 2006. Safety Analysis for Control Room Operators Human Error in one of Petrochemical Industries using HEART Technique. MSC thesis.TarbiatModarres University (TMU)
- Grozdanović, M. and Stojiljković E., 2006.Framework for Human Error Quantification, Philosophy, Sociology and Psychology. 5, pp. 18-23
- Jahangiri, M., 2004. Human ErrorsIdentification And Analysis in TehranRefinery Isomax Unit with PHEA technique.MSC thesis. Occupational Health Department,School of Public Health, Tehran University ofMedical Science
- Khan, F.I., Amyotte, P.R. and DiMattia, D.G., 2006. HEPI: A new tool for human error probability calculation for offshore operation. Safety Science. 44, pp. 313–334
- Lees Frank, P., 2004. Lees Loss Prevention in the Process Industries. Vol.1. Third edition
- Whittingham, R.B., 2004. The Blame Machine:Why Human Error Causes Accidents, ElsevierButterworth-Heinemann
- Carlos Conte J., Rubio E., Isabel García A., Cano F. (2011). Occupational accidents model based on risk–injury affinity groups. Safety Science, Volume 49, Issue 2, February 2011, Pages 306-314.
- Jasch Ch., Lavicka A. (2006). Pilot project on sustainability management accounting with the Styrian automobile cluster. Journal of Cleaner Production, Volume 14, Issue 14, 2006, Pages 1214-1227.