Identify and Analyze the Risks Involved in Tunnel Projects

Mohammad Ali Gafari1 * and Rahim Aminzadeh2

1 Azad University of Sirjan Research Science, Iran

2 Faculty Member of Professional and Technical University,

Corresponding author Email: Ghafari.a.civil@gmail

DOI: http://dx.doi.org/10.12944/CWE.10.Special-Issue1.129

Each year, large parts of credit and financial resources spent in large projects investment in construction and infrastructure. Tunneling is one of basic infrastructure of develop country even if faced with different risks. One of the biggest problems with project managers, identify and analyze the risks which causes efficiency reduction and sometimes is not successful to complete the project, In order should be tools decision, able to identify and analyze risks, created and developed. Many methods Have been proposed as a backup for identify risks, the one using breakdown structures of risk that would be hierarchy framework provides for potential sources of project risk. This study introduced a comprehensive tunneling project risks with method of risk breakdown structure.


Tunneling projects; Risk Breakdown Structure (RBS); Risk identification; Risk assessment

Copy the following to cite this article:

Gafari M. A, Aminzadeh R. Identify and Analyze the Risks Involved in Tunnel Projects. Special Issue of Curr World Environ 2015;10(Special Issue May 2015). DOI:http://dx.doi.org/10.12944/CWE.10.Special-Issue1.129

Copy the following to cite this URL:

Gafari M. A, Aminzadeh R. Identify and Analyze the Risks Involved in Tunnel Projects. Special Issue of Curr World Environ 2015;10(Special Issue May 2015).
Available from: http://cwejournal.org?p=784/